TPO, EPDM, modified bitumen, and standing-seam systems for warehouses, offices, retail, and multifamily — phased so your business never stops.
Commercial roofs fail at the details: drainage, penetrations, terminations. We start with core sampling and a moisture scan, design tapered insulation that actually drains, and install full systems — 60-mil TPO, EPDM, modified bitumen, or standing-seam metal — to manufacturer spec.
Work is phased around your operations: sections, weekends, or after-hours. Tenants stay open, inventory stays dry, and you get a single accountable crew from first core to final punch list.
It depends on moisture. If the core samples come back dry and you have only one existing system, a recover can save real money. Wet insulation means tear-off — covering it just locks the problem in.
No. We phase sections, schedule loud work around your hours, and keep entrances, loading docks, and HVAC operational throughout.
Yes — semi-annual inspections, drain clearing, and minor repairs that extend system life and protect your manufacturer warranty.
Find your property: Enter your address to get an instant roof estimate.